Outsunny 3 Piece 6ft Folding Picnic Table and Bench Set, Portable HDPE Camping Table and Chairs with Carrying Handles for Indoor Outdoor, Dining, Camping, Picnic, BBQ, Party, White

£77.89
Colour: White
Compare Color
Click On Color / Pattern To Compare, Click And Drag Images To Reorder
Ask a Question

Add your personalization

Add your name, note or upload your customized idea image to personalise your item. Custom items cannot be returned or exchanged.

Hurry Up! Only 11 left in stock!

Estimate delivery times: 3-5 days

Return within 7 days of purchase. Duties & taxes are non-refundable.

Outsunny 3 Piece 6ft Folding Picnic Table and Bench Set, Portable HDPE Camping Table and Chairs with Carrying Handles for Indoor Outdoor, Dining, Camping, Picnic, BBQ, Party, White
Outsunny 3 Piece 6ft Folding Picnic Table and Bench Set, Portable HDPE Camping Table and Chairs with Carrying Handles for Indoor Outdoor, Dining, Camping, Picnic, BBQ, Party, White
£77.89

Discover the great outdoors with the Outsunny Portable Picnic Table Set! This three-piece set includes a spacious fold away table and two benches, great for family picnics or festival outings. Crafted with a waterproof HDPE benchtop and a corrosion-resistant metal frame, it ensures safety with joint locks and non-slip pads. Easily portable, this camping furniture unfolds adventure wherever you go!

Features:

  • Three-piece set includes table and two benches for family outings
  • Benchtop features waterproof, anti-fading HDPE for easy maintenance
  • Powder-coated frame resists corrosion, enhances safety and stability
  • Safety locks prevent accidental folding and increase stability
  • Non-slip pads on legs protect floors, provide secure placement
  • Easy to fold with handles for quick setup and storage
  • Suitable for both indoor and outdoor use in various settings
  • No assembly required

Specification:

  • Colour: White, Light Grey
  • Material: Metal, HDPE
  • Table Dimension: 180L x 74W x 74H cm
  • Chair Dimension: 182L x 28W x 42H cm
  • Folding Dimension: 92L x 74W x 7H cm (table), 92L x 28W x 7.5H cm (chair)
  • Tabletop Size: 180L x 74W cm
  • Tabletop Height: 74 cm
  • Seat Size: 182W x 28D x 42H cm
  • Weight Capacity: 240 kg (chair), 50 kg (table)
  • Item Label: A20-469V00WT

Package Includes:

  • 1 x Table
  • 2 x Chair
  • 1 x Manual

For all orders exceeding a value of £100 shipping is offered for free.

Returns will be accepted for up to 7 days of Customer's receipt or tracking number on unworn items. You, as a Customer, are obliged to inform us via email before you return the item.

Otherwise, standard shipping charges apply. Check out our delivery Terms & Conditions for more details.

Returns will be accepted for up to 7 days of Customer's receipt or tracking number on unworn items. You, as a Customer, are obliged to inform us via email before you return the item, only in the case of:

– Received the wrong item.
– Item arrived not as expected (ie. damaged packaging).
– Item had defects.
– Over delivery time.
– The shipper does not allow the goods to be inspected before payment.

The returned product(s) must be in the original packaging, safety wrapped, undamaged and unworn. This means that the item(s) must be safely packed in a carton box for protection during transport, possibly the same carton used to ship to you as a customer.

Recently Viewed

Don't forget! The products that you viewed. Add it to cart now.

People Also Bought

Here’s some of our most similar products people are buying. Click to discover trending style.